Terry Bundy Generating Station is Lincoln Electric System's gas-fired plant in Lincoln, Nebraska, built around aeroderivative turbines, with the first three installed over twenty years ago. Part of its electricity has come from landfill gas piped from the city's Bluff Road Landfill. In February 2026 GE Vernova announced two LM6000VELOX packages that will add about 100 MW, scheduled to become operational in 2029.
Mapped infrastructure geometry associated with this asset.
EIA plant 7887 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| 1 | Natural Gas Fired Combined Cycle | Operating | 28.2 | Unknown |
| 2 | Natural Gas Fired Combined Cycle | Operating | 60.5 | Unknown |
| 3 |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| 1 | 28.2 MW 27.4 MW summer | Natural Gas Fired Combined Cycle CA | Aug 2004 | Operating |
| 2 | 60.5 MW 47.3 MW summer | Natural Gas Fired Combined Cycle CT | Oct 2003 | Operating |
| 3 | 60.5 MW 47.1 MW summer | Natural Gas Fired Combined Cycle CT | Apr 2004 | Operating |
| 4 | 60.5 MW 47.6 MW summer | Natural Gas Fired Combustion Turbine GT | Aug 2003 | Operating |
| BSU | 1.8 MW 1.6 MW summer | |||
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Where the plant sits in SPP: its market, pricing node, utility territory and the network around it, each with how it is known.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
EIA-860 lists generator 4 with this operating date.
| Natural Gas Fired Combined Cycle |
| Operating |
| 60.5 |
| Unknown |
| 4 | Natural Gas Fired Combustion Turbine | Operating | 60.5 | Unknown |
|---|
| BSU | Petroleum Liquids | Operating | 1.8 | Unknown |
|---|
| LFG1 | Landfill Gas | Operating | 1.6 | Unknown |
|---|
| LFG2 | Landfill Gas | Operating | 1.6 | Unknown |
|---|
| LFG3 | Landfill Gas | Operating | 1.6 | Unknown |
|---|
| 5 | Natural Gas Fired Combustion Turbine | Planned | 52 | Unknown |
|---|
| 6 | Natural Gas Fired Combustion Turbine | Planned | 52 | Unknown |
|---|
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
The site also falls inside the Norris Public Power District service territory.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| Rokeby | 266.1 MW | NE | |
| Terry Bundy Generating StationCurrent | 216.3 MW | NE | |
| J Street | 27 MW | NE | |
| 2nd & N BESS | 3 MW | NE |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioEIA-860 lists generator 2 with this operating date.
EIA-860 lists generator 3 with this operating date.
EIA-860 lists generator BSU with this operating date.
EIA-860 lists generator 1 with this operating date.
EIA-860 lists generator LFG1, generator LFG2, generator LFG3 with this operating date.
About 100 MW to be added, operational in 2029.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Terry Bundy Generating Station reports 209.7 MW natural gas + 1.8 MW petroleum + 4.8 MW biomass of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Terry Bundy Generating Station is a Natural Gas Fired Combined Cycle, Petroleum Liquids, Landfill Gas, Natural Gas Fired Combustion Turbine facility in Lancaster County, NE, participating in the SPP market.
Terry Bundy Generating Station is in Lancaster County, NE, inside the SPP balancing area.
Terry Bundy Generating Station is operated by Lincoln Electric System according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Terry Bundy Generating Station reported 148.4 GWh over the twelve months to 2026-08. Figures are net generation as filed to EIA-923.
By capacity, Terry Bundy Generating Station ranks #433 of 540 operating plants of the same technology nationally. It ranks #2 of 2 in NE.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.