Townsite Solar Project Hybrid is a 270 MW batteries, solar photovoltaic plant in Clark County. Townsite Solar Project is a 180 MWac / 231 MWdc solar plant in Boulder City, Nevada, paired with a 90 MWac / 360 MWh energy storage facility. Three long-term PPAs serving two municipalities and a cooperative were secured, Tenaska Power Services provides energy management, and construction was expected to finish by the end of 2021.
Mapped infrastructure geometry associated with this asset.
EIA plant 60654 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| GEN01 | Solar Photovoltaic | Operating | 180 | Unknown |
| GEN02 | Batteries | Operating | 90 | 360 |
Mapped infrastructure geometry associated with this asset.
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| GEN01 | 180 MW 160 MW summer | Solar Photovoltaic PV | Dec 2021 | Operating |
| GEN02 | 90 MW 90 MW summer | Batteries BA | Dec 2021 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Where the plant sits in CAISO: its market, pricing node, utility territory and the network around it, each with how it is known.
The site also falls inside the Nevada Power Co service territory.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Project milestones and public references behind the asset profile.
180 MWac solar with 90 MW / 360 MWh storage.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
EIA-860 lists generator GEN01, generator GEN02 with this operating date.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Townsite Solar Project reports 180 MW solar + 90 MW battery storage of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Townsite Solar Project is a Batteries, Solar Photovoltaic facility in Clark County, NV, participating in the CAISO market.
Townsite Solar Project is in Clark County, NV, inside the CAISO balancing area.
Townsite Solar Project is operated by Townsite Solar, LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Townsite Solar Project reported 458.2 GWh over the twelve months to 2026-08. Figures are net generation as filed to EIA-923.
By capacity, Townsite Solar Project ranks #231 of 7,597 operating plants of the same technology nationally. It ranks #12 of 68 in NV.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.