Townsite Solar Project Hybrid reports 180 MW solar + 90 MW battery storage in CAISO.
Mapped infrastructure geometry associated with this asset.
EIA plant 60654 · Inventory for Aug 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| GEN01 | Solar Photovoltaic | Operating | 180 | Unknown |
| GEN02 | Batteries | Operating | 90 | 360 |
Mapped infrastructure geometry associated with this asset.
Similar plants ranked by technology, capacity, and distance.
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| GEN01 | 180 MW 160 MW summer | Solar Photovoltaic Solar · PV | Dec 2021 | Operating |
| GEN02 | 90 MW 90 MW summer | Batteries Electricity used for energy storage · BA | Dec 2021 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Project milestones and public references behind the asset profile.
180 MWac solar with 90 MW / 360 MWh storage.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
EIA-860 lists generator GEN01, generator GEN02 with this operating date.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Townsite Solar Project reports 180 MW solar + 90 MW battery storage of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Aug 2026.
Townsite Solar Project is a Batteries, Solar Photovoltaic facility in Clark County, NV, participating in the CAISO market.
Townsite Solar Project is in Clark County, NV, inside the CAISO balancing area.
Townsite Solar Project is operated by Townsite Solar, LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Townsite Solar Project reported 463.3 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Townsite Solar Project ranks #231 of 7,597 operating plants of the same technology nationally. It ranks #12 of 68 in NV.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.