Medina Technology Park is a proposed 500 MW data center on a 265-acre site near Castroville in Medina County, Texas, developed by Tract through Medina County Power NR I, LLC. The developer's ERCOT large load schedule ramps peak demand from 240 MW in the first quarter of 2028 to 450 MW in 2029 and 500 MW in 2030. A dispute with ERCOT over how the load is classified was before the Texas Public Utility Commission in late 2026. The end-use customer is not named.
Loading map…
Overview
- Campus power
- 500 MW
- Campus Gross Power · Proposed
- Status
- Proposed
- Proposed campus
- IT floor area
- Not disclosed
- Campus
- Project scope
- Campus at 1400 CR4516, Castroville, TX.
- Power and grid
- Size of the data center stated in the large load filing
- Cooling and environment
Power and grid
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 500 MW | Campus Gross Power | Proposed | Exact Asset | — |
| Size of the data center stated in the large load filing | ||||
| 240 MW | Capacity basis unspecified | Target · target 2028 | energization-initial | — |
| Peak demand in the phased energization schedule, first quarter | ||||
| 450 MW | Capacity basis unspecified | Target · target 2029 | energization-second | — |
| Peak demand in the phased energization schedule, first quarter | ||||
| 500 MW | Capacity basis unspecified | Target · target 2030 | energization-third | — |
| Peak demand in the phased energization schedule, first quarter | ||||
- Utility
- Medina Electric Cooperative, Inc.
- ISO / RTO
Facility and development
- Water source
- East Medina County Special Utility District, under a non-standard service agreement then being negotiated
- Air permits
- Air permits for backup units planned through TCEQ permits by rule; a Title V permit may be required
- Permits and dockets
- PUCT docket for Medina County Power NR I, LLC complaint and appeal of ERCOT decisions
- Grid record
- Medina Electric Cooperative, Inc. · ERCOT · Planned new STEC-owned Alsatian 138 kV substation tying into the Castroville-Pearson 138 kV line
Organizations
Medina County Power NR I, LLCDeveloperExact Asset