TRG Datacenters Houston Data Center Campus
Operating
Operating
The TRG Houston Data Center campus is a colocation data center campus at 2626 Spring Cypress Road in Spring, Harris County, Texas, owned and operated by TRG Datacenters. The first data center, HOU1, has operated since 2018, and the second, HOU2, broke ground on November 14, 2025. The operator reports 6 MW live in HOU1, 24 MW of firm grid-connected power ready for HOU2 and HOU3, and 30 MW of confirmed power from CenterPoint for the campus. CenterPoint Energy supplies the campus within ERCOT and has designated it a non-residential critical load customer.
First data center on the campus
Second data center on the campus
Third data center, a custom-built extension
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 6 MW | Energized Power | Energized | Exact Asset | — |
| Live power in the first data center | ||||
| 24 MW | Available Power | Reported | Exact Asset | — |
| Firm grid-connected power ready for the second and third data centers; not energized IT load | ||||
| 24 MW | Utility Service | Under Construction | Exact Asset | — |
| Utility capacity added by the second data center; IT delivery as early as the target quarter | ||||
| 15 MW | Capacity basis unspecified | Target | Exact Asset | — |
| Capacity of the third data center available from the target quarter | ||||