Valero Energy Data Center
Operating
Valero Energy operates a 25,416-square-foot enterprise data center on a 25-acre site at 3535 Wiseman Boulevard in San Antonio, which became operational on May 1, 2020. No power capacity or data-hall square footage was identified.
Overview
- Status
- Operating
- Operating; the permit record is marked Project Closed and the facility became operational on May 1, 2020.
- Facility size
- 25,416 sq ft
- Facility
- Opened
- May 1, 2020
- Valero Energy Data Center
- Compute profile
- Enterprise
- Project scope
- The Valero Energy Data Center is an operating facility developed by Valero Energy. Pape-Dawson provided civil engineering and site-development services for the 25-acre facility, including redundant electrical and communications infrastructure, utilities, stormwater systems, grading, and platting.
Power and grid
- ISO / RTO
- ERCOT
- Redundancy
- The exact Valero Energy Data Center was designed with redundant electrical and communication facilities, underground electric and communications duct banks, and related redundant utilities. The public source does not specify the number of utility feeds or their electrical configuration.
Facility and development
- Gross floor area (sq ft)
- 25,416
- Site area (acres)
- 25
- Construction
- The Valero Energy Data Center is an operating facility developed by Valero Energy. Pape-Dawson provided civil engineering and site-development services for the 25-acre facility, including redundant electrical and communications infrastructure, utilities, stormwater systems, grading, and platting. The available permit record identifies an architectural-barriers compliance permit approved January 31, 2019, with proposed and actual operation on May 1, 2020; construction start and construction-completion dates were not identified.
Timeline
- Valero sells 33 acres surrounding data center to MicrosoftSan Antonio...
The article reports that Microsoft acquired 33.55 acres surrounding Valero's data center at 3535 Wiseman Boulevard. The subject is the surrounding-land transaction, not a change to the Valero facility itself.