Woodbridge Energy Center
Woodbridge Energy Center is a 725-megawatt natural gas-fueled combined-cycle power generation facility located in Woodbridge Township, Middlesex County, New Jersey. The plant uses two GE fast-start 7F 5-Series gas turbines and a D-11A steam turbine with associated generators in a 2×1 configuration. It entered commercial operation in January 2016 and is located on a brownfield site that was formerly a chemical plant. (U.S.A.) (11.22%); as of January 2026, CPV Group LP acquired the remaining interest and became 100% owner. The plant serves the PJM Interconnection's Eastern Mid-Atlantic Area Council (EMAAC) zone and is one of the nation's cleanest and most efficient power generation facilities with a combined-cycle efficiency of approximately 30% higher than conventional generation.