14 EIA-registered power plants in Jefferson County, LA totalling 5.3 GW of nameplate capacity, ranked and mapped inside MISO.
14 matching plants·ranked by nameplate capacity
| Rank | Plant | Capacity | ||||
|---|---|---|---|---|---|---|
| 1 | Nine Mile PointEntergy Louisiana LLCDetailed profile | 2,439.7 MW | Natural Gas Fired Combined Cycle, Natural Gas Steam Turbine | Entergy Louisiana LLC | Jefferson County | |
| 2 | White BluffEntergy Arkansas LLCDetailed profile | 1,800 MW | Conventional Steam Coal | Entergy Arkansas LLC | Jefferson County | |
| 3 | ConcordWisconsin Electric Power Co | 381.6 MW | Natural Gas Fired Combustion Turbine | Wisconsin Electric Power Co | Jefferson County | |
| 4 | Whitewater Generating StationWisconsin Electric Power Co | 283.5 MW | Natural Gas Fired Combined Cycle | Wisconsin Electric Power Co | Jefferson County | |
| 5 | Pine Bluff Energy CenterPine Bluff Energy LLC | 230.4 MW | Natural Gas Fired Combined Cycle | Pine Bluff Energy LLC | Jefferson County | |
| 6 | Pine Bluff MillSuzano Packaging LLC | 85 MW | Wood/Wood Waste Biomass | Suzano Packaging LLC | Jefferson County | |
| 7 | Crawfish RiverWisconsin Power & Light Co | 75 MW | Solar Photovoltaic | Wisconsin Power & Light Co | Jefferson County | |
| 8 | Grand Isle Gas Plant / Treating StationCox Operating LLC | 9 MW | Natural Gas Internal Combustion Engine | Cox Operating LLC | Jefferson County | |
| 9 | Deertrack Park Gas RecoveryWM Renewable Energy LLC | 6.4 MW | Landfill Gas | WM Renewable Energy LLC | Jefferson County | |
| 10 | Hackbarth Solar WI, LLCWisconsin Electric Power Co | 5 MW | Solar Photovoltaic | Wisconsin Electric Power Co | Jefferson County | |
| 11 | Rock LakeSolar WI, LLCWisconsin Electric Power Co | 5 MW | Solar Photovoltaic | Wisconsin Electric Power Co | Jefferson County | |
| 12 | Jones DairyWisconsin Electric Power Co | 2.3 MW | Solar Photovoltaic | Wisconsin Electric Power Co | Jefferson County | |
| 13 | Marlow Solar, LLC CSGMarlow Solar, LLC | 2 MW | Solar Photovoltaic | Marlow Solar, LLC | Jefferson County | |
| 14 | Jefferson Solar ParkConcord New Energy | 1 MW | Solar Photovoltaic | Concord New Energy | Jefferson County |
County assignment and capacity come from the EIA generator inventory. Capacity is nameplate capacity, not seasonal capability or available operating capacity. A plant can include multiple generators and technologies.