Alberta–Saskatchewan (McNeill)
AESO ↔ Saskatchewan · Back-to-back HVDC converter
The back-to-back converter at McNeill on the Alberta–Saskatchewan border, the only link between Alberta, in the Western Interconnection, and SaskPower, in the Eastern.
Operator readings
Compare each operator’s reading at its stated time. Scheduled transfers and metered physical flow measure different things.
- As AESO reports it
- 0 MW · Idle
Current reading · as of Nov 24, 2:44 PM MST
Last 30 days
Hourly readings, signed so that up is power leaving the market. Each series identifies whether it measures flow or a transfer schedule.
Above zero: AESO → Saskatchewan. Below: the reverse.
- Usual direction
- Saskatchewan → AESO in 27% of hours
14% out, 27% in, 59% idle across 721 hours
- Average
- 11 MW · Saskatchewan → AESO
- When busy
- 151 MW
95th percentile of hourly flow either way
- Peak AESO → Saskatchewan
- 151 MW
- Peak Saskatchewan → AESO
- 153 MW
- Direction changes
- 5
Hardware
Its terminals, placed from named HIFLD substations or other cited geospatial sources where available.
- Converter
- McNeill converter, Alberta
50.5990, -110.0239 · representative location · mapped source
Sources and method
Readings come from AESO interface readings. Each value is shown with its operator and source time; direction is normalized from that operator’s sign convention toward or away from AESO. A rating describes the equipment; an operator’s posted directional limit, when available, is a separate operating value. The map point identifies a sourced terminal or crossing where available, or a representative connection point; it does not trace the full route.