Alberta–British Columbia intertie
AESO ↔ British Columbia · AC transmission
The 500 kV line from Langdon, east of Calgary, to BC Hydro at Cranbrook, with two smaller 138 kV circuits beside it: Alberta's main tie to the rest of the Western Interconnection.
Operator readings
Compare each operator’s reading at its stated time. Scheduled transfers and metered physical flow measure different things.
- As AESO reports it
- 782 MW · AESO → British Columbia
Current reading · as of Nov 24, 11:44 PM MST
Last 30 days
Hourly readings, signed so that up is power leaving the market. Each series identifies whether it measures flow or a transfer schedule.
Above zero: AESO → British Columbia. Below: the reverse.
- Usual direction
- AESO → British Columbia in 87% of hours
87% out, 12% in, 1% idle across 721 hours
- Average
- 278 MW · AESO → British Columbia
- When busy
- 838 MW
95th percentile of hourly flow either way
- Peak AESO → British Columbia
- 941 MW
- Peak British Columbia → AESO
- 465 MW
- Direction changes
- 36
Hardware
Its terminals, placed from named HIFLD substations or other cited geospatial sources where available.
- Substation
- Langdon, Alberta
50.9599, -113.7198 · representative location · mapped source
- Substation
- Cranbrook, British Columbia
In Canada, outside HIFLD's coverage
Sources and method
Readings come from AESO interface readings. Each value is shown with its operator and source time; direction is normalized from that operator’s sign convention toward or away from AESO. A rating describes the equipment; an operator’s posted directional limit, when available, is a separate operating value. The map point identifies a sourced terminal or crossing where available, or a representative connection point; it does not trace the full route.