The 500 kV line from Langdon, east of Calgary, to BC Hydro at Cranbrook, with two smaller 138 kV circuits beside it: Alberta's main tie to the rest of the Western Interconnection.

Now
261 MWAESO → British Columbia
AESO · as of Oct 10, 11:34 AM MDT

What it is carrying

Each operator's own reading, turned into a direction. Where both markets publish the tie, the two should agree.

As AESO reports it
261 MW · AESO → British Columbia

as of Oct 10, 11:34 AM MDT

Last 30 days

Hourly flow, signed so that up is power leaving the market.

As AESO reports it236MW
1,074241-591Sep 10, 11 AMOct 10, 11 AM

Above zero: AESO → British Columbia. Below: the reverse.

Usual direction
AESO → British Columbia in 82% of hours

82% out, 17% in, 2% idle across 721 hours

Average
211 MW · AESO → British Columbia
When busy
860 MW

95th percentile of hourly flow either way

Peak AESO → British Columbia
959 MW
Peak British Columbia → AESO
476 MW
Direction changes
38
The average day
0:006:0012:0018:0023:00
Mean flow by the market's local hour. Up: AESO → British Columbia. Down: British Columbia → AESO.

Hardware

Its terminals, placed from named HIFLD substations or other cited geospatial sources where available.

Substation
Langdon, Alberta

In Canada, outside HIFLD's coverage

Substation
Cranbrook, British Columbia

In Canada, outside HIFLD's coverage

Sources and method

Flow comes from AESO interface readings. Each value is shown with its operator and source time; direction is normalized from that operator’s sign convention toward or away from AESO. A rating describes the equipment; an operator’s posted directional limit, when available, is a separate operating value. The map point identifies a sourced terminal or crossing where available, or a representative connection point; it does not trace the full route.

How intertie coverage is assembled