Montana–Alberta Tie Line
AESO ↔ Montana · AC transmission
A merchant 230 kV line from Picture Butte near Lethbridge to Great Falls, Montana. The map marks the international crossing at the GPS position in the owner's 2026 DOE filing. The matched AESO reading reports this link's transfer; the terminal coordinates come from the same filing.
Operator readings
Compare each operator’s reading at its stated time. Scheduled transfers and metered physical flow measure different things.
- As AESO reports it
- 34 MW · AESO → Montana
Current reading · as of Nov 24, 2:44 PM MST
Last 30 days
Hourly readings, signed so that up is power leaving the market. Each series identifies whether it measures flow or a transfer schedule.
Above zero: AESO → Montana. Below: the reverse.
- Usual direction
- AESO → Montana in 69% of hours
69% out, 26% in, 4% idle across 721 hours
- Average
- 45 MW · AESO → Montana
- When busy
- 200 MW
95th percentile of hourly flow either way
- Peak AESO → Montana
- 271 MW
- Peak Montana → AESO
- 224 MW
- Direction changes
- 60
- Hours near its rating
- 0 of 721
At 95% or more of 300 MW
Hardware
Its terminals, placed from named HIFLD substations or other cited geospatial sources where available.
- Substation
- Picture Butte 120S, Alberta
49.8272, -112.7343 · mapped source
- Substation
- Great Falls, MT
47.5433, -111.2218 · mapped source
Sources and method
Readings come from AESO interface readings. Each value is shown with its operator and source time; direction is normalized from that operator’s sign convention toward or away from AESO. A rating describes the equipment; an operator’s posted directional limit, when available, is a separate operating value. The map point identifies a sourced terminal or crossing where available, or a representative connection point; it does not trace the full route.