CAISO logo

Crag View

CAISO ↔ Pacific Northwest · Intertie scheduling point

CAISO’s CRAG intertie scheduling point. Its reading nets published import and export schedules across the balancing-area pairs using this point. The marker is at the named Crag View substation.

Scheduled now
0 MWIdle
CAISO · as of Oct 15, 12:10 PM PDT
Loading map…

Scheduled transfers

Compare each operator’s reading at its stated time. Scheduled transfers and metered physical flow measure different things.

As CAISO reports it · scheduled
0 MW · Idle

as of Oct 15, 12:10 PM PDT

Last 30 days

Hourly readings, signed so that up is power leaving the market. Each series identifies whether it measures flow or a transfer schedule.

As CAISO reports it · scheduled0MW
000Sep 15, 12 PMOct 15, 12 PM

Above zero: CAISO → Pacific Northwest. Below: the reverse.

Usual direction
CAISO → Pacific Northwest in 0% of hours

0% out, 0% in, 100% idle across 721 hours

Average
0 MW · Idle
When busy
0 MW

95th percentile of hourly scheduled transfers either way

Peak CAISO → Pacific Northwest
0 MW
Peak Pacific Northwest → CAISO
0 MW
Direction changes
0
The average day
0:006:0012:0018:0023:00
Mean reading by the market's local hour. Up: CAISO → Pacific Northwest. Down: Pacific Northwest → CAISO.

Hardware

Its terminals, placed from named HIFLD substations or other cited geospatial sources where available.

Substation
Crag View, CA

41.1849, -122.2860 · 115 kV

Sources and method

Schedules come from CAISO interface readings. Each value is shown with its operator and source time; direction is normalized from that operator’s sign convention toward or away from CAISO. A rating describes the equipment; an operator’s posted directional limit, when available, is a separate operating value. The map point identifies a sourced terminal or crossing where available, or a representative connection point; it does not trace the full route.

How intertie coverage is assembled