Eldorado 230 kV

CAISO ↔ Nevada · Intertie scheduling point

CAISO’s ELDORADO230 intertie scheduling point. Its reading nets published import and export schedules across the balancing-area pairs using this point. The marker is at the named Eldorado substation.

Scheduled now
77 MWCAISO → Nevada
CAISO · as of Oct 15, 12:10 PM PDT
Loading map…

Scheduled transfers

Compare each operator’s reading at its stated time. Scheduled transfers and metered physical flow measure different things.

As CAISO reports it · scheduled
77 MW · CAISO → Nevada

as of Oct 15, 12:10 PM PDT

Last 30 days

Hourly readings, signed so that up is power leaving the market. Each series identifies whether it measures flow or a transfer schedule.

As CAISO reports it · scheduled35MW
923-1-924Sep 15, 12 PMOct 15, 12 PM

Above zero: CAISO → Nevada. Below: the reverse.

Usual direction
CAISO → Nevada in 66% of hours

66% out, 19% in, 15% idle across 721 hours

Average
152 MW · CAISO → Nevada
When busy
760 MW

95th percentile of hourly scheduled transfers either way

Peak CAISO → Nevada
796 MW
Peak Nevada → CAISO
797 MW
Direction changes
64
The average day
0:006:0012:0018:0023:00
Mean reading by the market's local hour. Up: CAISO → Nevada. Down: Nevada → CAISO.

Hardware

Its terminals, placed from named HIFLD substations or other cited geospatial sources where available.

Substation
Eldorado, NV

35.7973, -115.0085 · 500 kV

Sources and method

Schedules come from CAISO interface readings. Each value is shown with its operator and source time; direction is normalized from that operator’s sign convention toward or away from CAISO. A rating describes the equipment; an operator’s posted directional limit, when available, is a separate operating value. The map point identifies a sourced terminal or crossing where available, or a representative connection point; it does not trace the full route.