Mead 230 kV
CAISO ↔ Lower Colorado · Intertie scheduling point
CAISO’s MEAD230 intertie scheduling point. Its reading nets published import and export schedules across the balancing-area pairs using this point. The marker is at the named Mead substation.
Scheduled transfers
Compare each operator’s reading at its stated time. Scheduled transfers and metered physical flow measure different things.
- As CAISO reports it · scheduled
- 248 MW · Lower Colorado → CAISO
as of Oct 15, 12:10 PM PDT
Last 30 days
Hourly readings, signed so that up is power leaving the market. Each series identifies whether it measures flow or a transfer schedule.
Above zero: CAISO → Lower Colorado. Below: the reverse.
- Usual direction
- CAISO → Lower Colorado in 67% of hours
67% out, 23% in, 10% idle across 721 hours
- Average
- 71 MW · CAISO → Lower Colorado
- When busy
- 317 MW
95th percentile of hourly scheduled transfers either way
- Peak CAISO → Lower Colorado
- 631 MW
- Peak Lower Colorado → CAISO
- 429 MW
- Direction changes
- 77
Hardware
Its terminals, placed from named HIFLD substations or other cited geospatial sources where available.
- Substation
- Mead, NV
35.9278, -114.8347 · 500 kV
Sources and method
Schedules come from CAISO interface readings. Each value is shown with its operator and source time; direction is normalized from that operator’s sign convention toward or away from CAISO. A rating describes the equipment; an operator’s posted directional limit, when available, is a separate operating value. The map point identifies a sourced terminal or crossing where available, or a representative connection point; it does not trace the full route.