Energía Sierra Juárez tie line
CAISO ↔ Baja California · AC transmission
Two 230 kV circuits from SDG&E's East County substation across the U.S.–Mexico border to the Energía Sierra Juárez wind project in Baja California. DOE reports the line operating since 2015. Its marker is the border crossing specified in the permit filing; no dedicated live flow is matched to this profile.
Hardware
Its terminals, placed from named HIFLD substations or other cited geospatial sources where available.
- Substation
- East County (ECO) substation, CA
32.6273, -116.1179 · 500 kV
- Substation
- Energía Sierra Juárez wind project, Baja California
In Mexico, outside HIFLD's coverage
Sources and method
No operator flow feed is linked to this profile. The map and hardware describe the registered connection, not a current power transfer. A rating describes the equipment; an operator’s posted directional limit, when available, is a separate operating value. The map point identifies a sourced terminal or crossing where available, or a representative connection point; it does not trace the full route.