FIRST_BP_LNODEXF2
FIRST_BP_LNODEXF2 is a BPAT market pricing point in the BPAT zone. It is a pricing location, not a physical asset; its locational marginal price represents the marginal value of electricity at this point on the grid.
- Current real-time LMP
- —
- Waiting for the latest settlement
- Typical price
- —
- No trailing price profile
- Grid location
- BPAT zone
- Market pricing location
- Mapped facility
- No direct facility mapping
- No physical facility crosswalk published
What happened
Operator events at this pricing point, and outages of the units that settle here with what each did to its price.
Around it
What this pricing point stands for, and the plants, settlement points and territory near it.
- Location type
- LOAD settlement point
BPA settlement point FIRST_BP_LNODEXF2.
- Nearest power plant
- Horn Rapids Solar, Storage and Training
2.2 miles away · 4.2 MW · solar