Colorado Bend II Generating Station
Colorado Bend II Generating Station is the ERCOT market pricing point associated with Colorado Bend II, a 1,230.3 MW natural gas facility in Wharton County. It is a pricing location, not the physical plant itself; its locational marginal price represents the marginal value of electricity at this point on the grid.
- Current real-time LMP
- —
- Waiting for the latest settlement
- Typical price
- —
- No trailing price profile
- Grid location
- Coast zone
- Market pricing location
- Mapped facility
- Colorado Bend II
- 1,230.3 MW natural gas · ERCOT crosswalk
What happened
Operator events at this pricing point, and outages of the units that settle here with what each did to its price.
Around it
What this pricing point stands for, and the plants, settlement points and territory near it.
- Location type
- Settlement point
ERCOT settlement point CBECII_2.
Connections
- Plants at this site
- Colorado Bend IISame site