
Gravel Neck Generating Station — TX1 station load bus (GRAVLNK GT3)
Gravel Neck Generating Station — TX1 station load bus (GRAVLNK GT3) is a PJM market pricing point in the DOM zone. It is a pricing location, not a physical asset; its locational marginal price represents the marginal value of electricity at this point on the grid.
- Current real-time LMP
- —
- Waiting for the latest settlement
- Typical price
- —
- No trailing price profile
- Grid location
- DOM zone
- Market pricing location
- Mapped facility
- No direct facility mapping
- No physical facility crosswalk published
Asset facts
Market identity, price telemetry, and nearby grid context.
- Settlement point
- GEN settlement point
PJM settlement point 34887845.
- Grid location
- DOM zone
Map coordinate 37.1575, -76.6911.
- Nearest power plant
- Gravel Neck
0.1 miles away · 407.7 MW · natural gas
- Price record
- No precomputed price profile is attached yet.