Beacon Substation, Hilliard, Ohio (BEACON DARBY1)
Beacon Substation, Hilliard, Ohio (BEACON DARBY1) is a PJM market pricing point in the AEP zone. It is a pricing location, not a physical asset; its locational marginal price represents the marginal value of electricity at this point on the grid.
- Current real-time LMP
- —
- Waiting for the latest settlement
- Typical price
- —
- No trailing price profile
- Grid location
- AEP zone
- Market pricing location
- Mapped facility
- No direct facility mapping
- No physical facility crosswalk published
Asset facts
Market identity, price telemetry, and nearby grid context.
- Settlement point
- LOAD settlement point
PJM settlement point 2156114550.
- Grid location
- AEP zone
Map coordinate 40.0145, -83.1221.
- Nearest power plant
- 3100 Valleyview Drive
6.3 miles away · 1 MW · solar
- Price record