Hydro-Québec logo

HQ Hydro-Québec Electricity Demand (history)

Hydro-Québec's archive of hourly average electricity demand in Québec from 2019 through the end of 2024.

About this data

Each row is the hourly average demand in Québec from Hydro-Québec's open data archive, covering 2019 through the end of 2024. It is a multi-year hourly record, suited to studying seasonal load shape and winter peaks in Québec.

What people use it for

  • Study Québec's seasonal load shape
  • Find winter peak days
  • Compare years of Québec demand

Where to use it

In Ask the Grid

Ask about it, see it live

The grid agent reads it to answer questions about Hydro-Québec. Every answer names the data it read and links back here.

In ATG Data

Build with the full table

Schema, full history, coverage and query rules live in Data, where you can browse every row, run SQL and connect it to your own code.

Plans and access

Latest data

Loading…

Questions

Which data provider has HQ Hydro-Québec Electricity Demand (history) data?
Ask the Grid has it, from Hydro-Québec open data (CC BY-NC 4.0). You can browse every row in Ask the Grid Data, query it with SQL or the Ask the Grid API, or ask the grid agent about it in plain English.
Where does HQ Hydro-Québec Electricity Demand (history) come from?
It comes from Hydro-Québec open data (CC BY-NC 4.0). This page links to the original publication, so any value can be checked against it.
How do I download or query HQ Hydro-Québec Electricity Demand (history)?
Open the hydroquebec.historique_demande_electricite_quebec table in Ask the Grid Data to browse every row and run SQL against it, or call it from code through the Ask the Grid API. Full history can be delivered on a schedule to Snowflake, Databricks or your own storage.
Can I ask questions about HQ Hydro-Québec Electricity Demand (history) in plain English?
Yes. The grid agent reads this data when a question needs it, for example "what was quebec's peak demand in 2023", and every answer names the dataset it read.