Hydro-Québec logo

HQ Hydro-Québec Heritage Pool Hourly Reconciliation

Hydro-Québec's hourly reconciliation filed with the Régie de l'énergie for supply beyond the heritage pool, from 2009 to 2025.

Published by Hydro-Québec open data (CC BY-NC 4.0) (opens in a new tab)Cadence: annual filings, hourly rows, 2009–2025HydrologyHydro-Québec market

About this data

Each row is an hourly measure from Hydro-Québec's annual filings with the Régie de l'énergie: generation, deliveries to the distributor, heritage-pool volumes, exceedance volumes, their unit cost and total hourly cost, and the NYISO-derived benchmark components. Both the framework-agreement and proxy methods are included. It shows how Hydro-Québec priced supply above the heritage pool, hour by hour.

What people use it for

  • See hourly heritage-pool and exceedance volumes
  • Compare the framework-agreement and proxy methods
  • Study how supply beyond the heritage pool was costed

Where to use it

In Ask the Grid

Ask about it, see it live

The grid agent reads it to answer questions about Hydro-Québec. Every answer names the data it read and links back here.

In ATG Data

Build with the full table

Schema, full history, coverage and query rules live in Data, where you can browse every row, run SQL and connect it to your own code.

Plans and access

Latest data

Loading…

Questions

Which data provider has HQ Hydro-Québec Heritage Pool Hourly Reconciliation data?
Ask the Grid has it, from Hydro-Québec open data (CC BY-NC 4.0). You can browse every row in Ask the Grid Data, query it with SQL or the Ask the Grid API, or ask the grid agent about it in plain English.
Where does HQ Hydro-Québec Heritage Pool Hourly Reconciliation come from?
It comes from Hydro-Québec open data (CC BY-NC 4.0). This page links to the original publication, so any value can be checked against it.
How do I download or query HQ Hydro-Québec Heritage Pool Hourly Reconciliation?
Open the hydroquebec.regulatory_hourly table in Ask the Grid Data to browse every row and run SQL against it, or call it from code through the Ask the Grid API. Full history can be delivered on a schedule to Snowflake, Databricks or your own storage.
Can I ask questions about HQ Hydro-Québec Heritage Pool Hourly Reconciliation in plain English?
Yes. The grid agent reads this data when a question needs it, for example "how much power did hydro-quebec supply beyond the heritage pool", and every answer names the dataset it read.