Sargent & Lundy
construction contractor · owner · PJM · SPP
Sargent & Lundy is linked to 3 published PJM and SPP power assets through source-backed construction contractor, owner relationships.
Coverage in Ask the Grid
Asset relationships- Linked asset profiles
- 3
- Linked capacity
- 1.9 GW
- Roles in coverage
- 2
PJM · SPP profiles reviewed by Ask the Grid
Sum of capacity on linked asset profiles
3 public relationship sources
Coverage includes the published profiles below. Linked capacity adds their reported ratings.
Related power assets
| Asset | Relationship | Capacity | Effective | |
|---|---|---|---|---|
| SoonerConventional Steam Coal · EIA 6095 | owner | 1,138 MW | Not dated | |
| Anadarko PlantNatural Gas Fired Combined Cycle, Natural Gas Fired Combustion Turbine · EIA 3006 | owner | 540.3 MW | Not dated | |
| Blackstone Wind Farm II LLCOnshore Wind Turbine · EIA 57113 | construction contractor | 200 MW | Not dated |
Ownership, operation, development and financing are shown as separate relationships.