Agua Caliente Solar Project is a utility-scale photovoltaic facility in Dateland, Yuma County, Arizona, comprising more than 4.9 million First Solar thin-film cadmium-telluride modules. It is located on approximately 2,400 acres of previously disturbed farmland and interconnects to the Palo Verde–North Gila 500 kV transmission line within the CAISO balancing authority. The project is currently owned 51% by Clearway Energy, Inc., which consolidates the asset, and 49% by BHE Renewables (formerly represented by MidAmerican Energy Holdings Company).
Mapped infrastructure geometry associated with this asset.
EIA plant 57373 · Inventory for Oct 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| AGU1 | Solar Photovoltaic | Operating | 90.7 | Unknown |
| AGU2 | Solar Photovoltaic | Operating | 136 | Unknown |
| AGU3 | Solar Photovoltaic | Operating | 121 | Unknown |
| AGU01 | Solar Photovoltaic | canceled_or_postponed | 290 | Unknown |
The CPUC’s Agua Caliente resolution describes its Palo Verde–North Gila transmission connection and PG&E power purchase agreement. SDG&E’s relationship concerns shared transmission infrastructure; the project’s purchaser and transmission parties have distinct roles.
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| AGU1 | 90.7 MW 90.7 MW summer | Solar Photovoltaic PV | May 2012 | Operating |
| AGU2 | 136 MW 136 MW summer | Solar Photovoltaic PV | Dec 2012 | Operating |
| AGU3 | 121 MW 121 MW summer | Solar Photovoltaic PV | Feb 2014 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Where the plant sits in CAISO: its market, pricing node, utility territory and the network around it, each with how it is known.
The site also falls inside the Wellton-Mohawk Irr & Drain Dist service territory.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
NextLight was formed by Energy Capital Partners as a developer of utility-scale solar projects.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
First Solar acquired NextLight and along with it the rights to develop Agua Caliente.
NRG Energy and First Solar announced that NRG would acquire the 290 MW Agua Caliente project from First Solar.
The Department of Energy issued a $967 million Title XVII loan guarantee to support the project's construction financing.
EIA-860 lists generator AGU1 with this operating date.
EIA-860 lists generator AGU2 with this operating date.
EIA-860 lists generator AGU3 with this operating date.
According to the Department of Energy, the 290 MW photovoltaic project reached full commercial operations in April 2014. Construction on the second 190 MW phase was completed in April 2014.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
The CPUC’s Agua Caliente resolution describes its Palo Verde–North Gila transmission connection and PG&E power purchase agreement. SDG&E’s relationship concerns shared transmission infrastructure; the project’s purchaser and transmission parties have distinct roles.
Agua Caliente Solar Project reports 347.7 MW solar of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Oct 2026.
Agua Caliente Solar Project is a Solar Photovoltaic facility in Yuma County, AZ, participating in the CAISO market.
Agua Caliente Solar Project is in Yuma County, AZ, inside the CAISO balancing area.
Agua Caliente Solar Project is operated by Agua Caliente Solar according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Agua Caliente Solar Project reported 502.6 GWh over the twelve months to 2026-08. Figures are net generation as filed to EIA-923.
By capacity, Agua Caliente Solar Project ranks #28 of 7,597 operating plants of the same technology nationally. It ranks #3 of 126 in AZ.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.