Outpost Solar is a Webb County project connected to Electric Transmission Texas at the 345 kV Avanzada station. The public records use different capacity bases—515 MW nameplate in the EIA/FERC record and 629 MW in Repsol's operating-project description—so this profile preserves both rather than collapsing them into a false single figure; commercial operations began in September 2025.
Mapped infrastructure geometry associated with this asset.
EIA plant 68838 · Inventory for Aug 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| RROS | Solar Photovoltaic | Operating | 515 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| RROS | 515 MW 515 MW summer | Solar Photovoltaic Solar · PV | Aug 2025 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| Hecate Energy Longhorn Solar LLC | |||
Project milestones and public references behind the asset profile.
Hecate Energy Outpost Solar LLC proposed a 514 MWac photovoltaic facility and battery energy storage system on approximately 18,500 acres in Webb County, approximately 30 miles northeast of Laredo, and filed for a tax value limitation with United Independent School District.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
2 ERCOT market resources · Solar
Capacity factor is average output vs. this plant's observed peak.
Observed ERCOT settlement prices at OUTP_SLR_RN over 365 days (2025-10-12 to 2026-10-11).
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Matched to the latest available ERCOT generation-interconnection queue record. Queue status and completion dates describe the queue record; operating status is verified separately against plant and market registrations.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
Construction on the Outpost solar farm began in late 2024, with Primoris Renewable Energy serving as engineering, procurement and construction (EPC) contractor. More than 1.3 million Siemens solar panels were installed.
EIA-860 lists generator RROS with this operating date.
Repsol announced commercial operations at the 629 MW Outpost solar facility in Webb County, Texas, near Laredo. The project is connected to the ERCOT grid and linked to a long-term power purchase agreement (PPA). This is Repsol's fourth utility-scale solar facility in operation in the United States.
Stonepeak agreed to acquire a 43.8% stake in the 629 MW Outpost solar project from Repsol for $252.5 million (€220 million), creating joint control of the project.
The sale of a 43.8% interest in the 629 MW operating Outpost solar project to Stonepeak closed after satisfaction of conditions precedent. Consideration was $253 million; the companies jointly control the holding company.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Hecate Energy Outpost Solar reports 515 MW solar of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Aug 2026.
Hecate Energy Outpost Solar is a Solar Photovoltaic facility in Webb County, TX, participating in the ERCOT market.
Hecate Energy Outpost Solar is in Webb County, TX, inside the ERCOT balancing area.
Hecate Energy Outpost Solar is operated by Repsol Renewables NA according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Hecate Energy Outpost Solar reported 1,233.9 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Hecate Energy Outpost Solar ranks #9 of 7,597 operating plants of the same technology nationally. It ranks #3 of 242 in TX.