Alliant Energy Neenah
Alliant Energy Neenah is a natural gas-fired peaking plant in the town of Neenah, Wisconsin, that began operation in 2000. Alliant is upgrading the station with more efficient, fast-ramping gas turbines to raise capacity from 300 MW to roughly 440 MW, with construction planned from August 2025 to summer 2026.
Overview
- Registry anchor
- Plant 55135
- plant-55135
Infrastructure record
- Alternate name
- Alliant Energy Neenah Power Plant
- Mapped facility footprint
- Mapped infrastructure footprint
Mapped infrastructure geometry associated with this asset.