Amazon AWS IAD-59
Proposed
Proposed
Amazon AWS IAD-59 is a planned Amazon Web Services data-center building at 7600 Doane Drive in Manassas, Virginia, within PJM. Prince William County's Build Out Analysis records 226,132 square feet of planned gross floor area; that figure describes the proposed building, not IT load. No newer exact-building evidence is used to describe the project as operating, and no facility demand, serving substation, or interconnection point is inferred.
Amazon AWS IAD-59 is one exact building at 7600 Doane Drive. The county record gives a planned GFA of 226,132 sq ft, Planned building status, Planned permit status, no permit case, and no occupancy date. Exact-building sources report the facility as operating and one source reports a 2014 year built, but no source explicitly establishes IAD59's construction start, construction completion, or commercial-operation date. The May 8, 2014 DEQ permit covers 7600 Doane Drive (IAD59) together with IAD-52 and IAD-14 and authorizes construction and operation of diesel generators; its date is not treated as the building's online date.
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 2.5 MW | Backup Generation | Approved | Exact Asset | 2014-05-08 |
| One Caterpillar Model 3516C-HD diesel engine-generator set rated at 2,500 ekW. | ||||
| 2 MW | Backup Generation | Approved | Exact Asset | 2014-05-08 |
| Each of twelve Caterpillar Model 3516C diesel engine-generator sets rated at 2,000 ekW each. | ||||
Also reported as Amazon IAD59.
A local report on Virginia data-center emissions regulation includes a caption identifying three data centers along Doane Drive, including 7600 Doane Drive and the parcel matching IAD-59. It reports that one of the three was Amazon-owned and the other two were owned by BRE Foxtrot.