Aratina Solar Center 1A is part of Aratina 1, the first phase of Avantus' Aratina Solar Center solar-plus-storage project in Kern County, California, which reached commercial operations in July 2026 delivering 200 MW of solar and 500 MWh of storage. Avantus plans to keep a controlling stake and operate it. Central Coast Community Energy and Silicon Valley Clean Energy buy the full output under long-term power purchase agreements.
Mapped infrastructure geometry associated with this asset.
EIA plant 68661 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| 64BES | Batteries | Operating | 75 | 300 |
| 64NB8 | Solar Photovoltaic | Operating | 120 | Unknown |
Mapped infrastructure geometry associated with this asset.
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| 64BES | 75 MW 75 MW summer | Batteries BA | Jul 2026 | Operating |
| 64NB8 | 120 MW 120 MW summer | Solar Photovoltaic PV | Jul 2026 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Where the plant sits in CAISO: its market, pricing node, utility territory and the network around it, each with how it is known.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
EIA-860 lists generator 64BES, generator 64NB8 with this operating date.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Aratina Solar Center 1A reports 75 MW battery storage + 120 MW solar of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Aratina Solar Center 1A is a Solar Photovoltaic, Batteries facility in San Bernardino County, CA, participating in the CAISO market.
Aratina Solar Center 1A is in San Bernardino County, CA, inside the CAISO balancing area.
Aratina Solar Center 1A is operated by 64NB 8me LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Aratina Solar Center 1A reported 42.3 GWh over the twelve months to 2026-08. Figures are net generation as filed to EIA-923.
By capacity, Aratina Solar Center 1A ranks #421 of 7,597 operating plants of the same technology nationally. It ranks #75 of 972 in CA.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.