Archtop Solar
Archtop Solar reports 286.8 MW solar in MISO.
Overview
- Registry anchor
- Plant 69521
- plant-69521
Structured profile
- Technology
- Solar Photovoltaic
- Operator
- Earthrise Energy
- Operating status
Archtop Solar reports 286.8 MW solar in MISO.
EIA plant 69521 · Inventory reporting month unavailable.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| ARCH1 | Solar Photovoltaic | Operating | 61.4 | Unknown |
| ARCH2 | Solar Photovoltaic | Operating | 53.3 | Unknown |
| ARCH3 | Solar Photovoltaic | Operating | 36.9 | Unknown |
| ARCH4 | Solar Photovoltaic | Operating | 24.6 | Unknown |
| ARCH5 | Solar Photovoltaic | Operating | 49.2 | Unknown |
| ARCH6 | Solar Photovoltaic | Operating | 61.4 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Solar · 273.6 MW
Cumberland County
Solar · 265 MW
Jasper County
Solar · 250 MW
Sullivan County
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| ARCH1 | 61.4 MW 61.4 MW summer | Solar Photovoltaic Solar · PV | Jun 2026 | Operating |
| ARCH2 | 53.3 MW 53.3 MW summer | Solar Photovoltaic Solar · PV | Jun 2026 | Operating |
| ARCH3 | 36.9 MW 36.9 MW summer | Solar Photovoltaic Solar · PV | Jun 2026 | Operating |
| ARCH4 | 24.6 MW 24.6 MW summer | Solar Photovoltaic Solar · PV | Jun 2026 | Operating |
| ARCH5 | 49.2 MW 49.2 MW summer | Solar Photovoltaic Solar · PV | Jun 2026 | Operating |
| ARCH6 | 61.4 MW 61.4 MW summer | Solar Photovoltaic Solar · PV | Jun 2026 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
Project milestones and public references behind the asset profile.
EIA-860 lists generator ARCH1, generator ARCH2, generator ARCH3, generator ARCH4, generator ARCH5, generator ARCH6 with this operating date.
Gibson City Solar 1 and 2 totaling 270 MWac online.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Archtop Solar reports 286.8 MW solar of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Form 860M.
Archtop Solar is a Solar Photovoltaic facility in Ford County, IL, participating in the MISO market.
Archtop Solar is in Ford County, IL, inside the MISO balancing area.
Archtop Solar is operated by Archtop Property Management LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Archtop Solar reported 178 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Archtop Solar ranks #66 of 7,597 operating plants of the same technology nationally. It ranks #2 of 456 in IL.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.