Bent Tree Wind Farm Phase 1 is a 201 MW wind farm near Albert Lea in Freeborn County, Minnesota, with 122 turbines. Alliant Energy's farm entered service in February 2011 and powers approximately 53,000 homes. It has generated over $5 million in tax revenue for Freeborn County and over $10 million in landowner lease payments. In May 2025 Alliant proposed the adjacent Bent Tree North Wind Farm, a 153 MW expansion.
EIA plant 57198 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | Operating | 201.3 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| 1 | 201.3 MW 201.3 MW summer | Onshore Wind Turbine WT | Feb 2011 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Where the plant sits in MISO: its market, pricing node, utility territory and the network around it, each with how it is known.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
122 turbines
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| Columbia (WI) | 1,112 MW | WI | |
| West Riverside Energy Center | 727.6 MW | WI | |
| Riverside Energy Center | 674.9 MW | WI | |
| Edgewater | 413.7 MW | WI | |
| South Fond Du Lac | 381.6 MW | WI | |
| Alliant Energy Neenah | 371 MW | WI | |
| Sheboygan Falls | 346.8 MW | WI | |
| Grant County | 300 MW | WI |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioAnswered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Bent Tree Wind Farm Phase 1 reports 201.3 MW wind of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Bent Tree Wind Farm Phase 1 is a Onshore Wind Turbine facility in Freeborn County, MN, participating in the MISO market.
Bent Tree Wind Farm Phase 1 is in Freeborn County, MN, inside the MISO balancing area.
Bent Tree Wind Farm Phase 1 is operated by Wisconsin Power & Light Co according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Bent Tree Wind Farm Phase 1 reported 334.1 GWh over the twelve months to 2025-12. Figures are net generation as filed to EIA-923.
By capacity, Bent Tree Wind Farm Phase 1 ranks #257 of 1,374 operating plants of the same technology nationally. It ranks #5 of 122 in MN.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.