Buckeye Wind Energy Center
Buckeye Wind Energy Center reports 200.5 MW wind in SPP.
Overview
- Registry anchor
- Plant 58767
- plant-58767
Infrastructure record
- Turbines
- 10
- Manufacturers
- GE
- In service
Buckeye Wind Energy Center reports 200.5 MW wind in SPP.
EIA plant 58767 · Inventory for Aug 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | Operating | 200.5 | Unknown |
| 2 | Onshore Wind Turbine | canceled_or_postponed | 70.3 | Unknown |
| 3 | Onshore Wind Turbine | canceled_or_postponed | 105.5 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Wind · 212.8 MW
Ness County
Wind · 201 MW
Ellsworth County
Wind · 195.8 MW
Thomas County
Wind · 201 MW
Cloud County
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| 1 | 200.5 MW 200.5 MW summer | Onshore Wind Turbine Wind · WT | Aug 2015 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| Lackawanna Energy Center | 1,498.5 MW | PA | |
| Grays Harbor Energy Facility | 714.9 MW | WA | |
| Nelson Energy Center | 627.5 MW | IL | |
| Hardee Power Station | 470.1 MW | FL | |
| Spindle Hill Energy Center | 420 MW | CO | |
| Invenergy Nelson Expansion LLC | 380 MW | IL | |
Project milestones and public references behind the asset profile.
EIA-860 lists generator 1 with this operating date.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Buckeye Wind Energy Center reports 200.5 MW wind of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Aug 2026.
Buckeye Wind Energy Center is a Onshore Wind Turbine facility in Ellis County, KS, participating in the SPP market.
Buckeye Wind Energy Center is in Ellis County, KS, inside the SPP balancing area.
Buckeye Wind Energy Center is operated by Invenergy Services LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Buckeye Wind Energy Center reported 416.3 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Buckeye Wind Energy Center ranks #272 of 1,374 operating plants of the same technology nationally. It ranks #19 of 52 in KS.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.