Cipher Digital Barber Lake
Under Construction · 951 CR 204, Colorado City, TX
Fluidstack leases the site under colocation agreements for 168 MW plus 39 MW of critical IT load, with Google backstopping Fluidstack's lease obligations. A TDLR filing covers an 800,000 sq ft data center facility; data halls are due from Q4 2026 through Q1 2027. The site runs on its own water supply, and Cipher commits to curtail load during ERCOT grid emergencies.
Loading map…
Overview
- Exact-site power
- 168 MW
- Critical IT Load · Reported
- Status
- Under Construction
- Construction started Oct 13, 2025
- Facility size
- 800,000 sq ft
- Facility
- Build window
- Oct 13, 2025–2026-Q4 to 2027-Q1
- Individual data halls to be delivered from Q4 2026 through Q1 2027, with rent commencing per hall; building topped out April 2026.
- Compute profile
- AI HPC · Colocation
Power and grid
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 244 MW | Capacity basis unspecified | Reported | Exact Asset | — |
| Gross capacity supporting Fluidstack's initial 168 MW critical IT lease (September 2025); basis unspecified. | ||||
| 168 MW | Critical IT Load | Reported | Exact Asset | — |
| Initial 10-year Fluidstack HPC colocation agreement. | ||||
| 39 MW | Critical IT Load | Reported | Exact Asset | — |
| Additional Fluidstack critical IT load (November 2025), supported by up to 56 MW more gross capacity; Fluidstack then leases the entire 300 MW site. | ||||
- Substation
- Newly constructed, fully energized high-to-mid voltage substation acquired with the site
- Grid flexibility
Facility and development
- Gross floor area (sq ft)
- 800,000
- Facility class
- AI HPC · Colocation
- Water source
- On-site water supply; draws nothing from Colorado City's municipal system
- Permits and dockets
- TDLR TABS2026023534 (Barber Lake) · EPA ICIS-NPDES stormwater construction TXR1541VR