DataBank HOU3 Data Center
Operating
Operating
DataBank HOU3 occupies 11003 Corporate Centre Drive on Houston’s Westway Park campus. The operator reports 41,860 IT square feet and 6.5 MW of critical IT load, with N+1 power, N+2 cooling and advertised air- and liquid-cooled cabinet-density capabilities. Its current page lists 40 onsite carriers; the Q4 2025 datasheet lists 38. Formerly CyrusOne Houston West III, the facility joined DataBank through its four-facility Houston acquisition in 2022. In May 2026, DataBank announced a planned 3,150 kW rooftop solar array, with expected annual output of 4.5 million kWh and Wunder Power handling design, construction and maintenance.
DataBank announced a 3,150 kW rooftop solar project on May 12, 2026, with expected annual output of 4.5 million kWh and an anticipated 25-year operating life. Wunder Power will manage design, construction, monitoring and maintenance.
The site also falls inside the San Bernard Electric Coop, Inc service territory.
The shared Westway Park campus receives power from an off-site CenterPoint Energy substation through multiple 25 MW feeds, according to DataBank.
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 6.5 MW | Critical IT Load | Reported | Exact Asset | — |
| DataBank reports 6.5 MW critical IT load for HOU3. | ||||
| 3.15 MW | Onsite Generation | Target | Planned rooftop solar array | 2026-05-12 |
| Planned 3,150 kW rooftop solar array announced May 12, 2026; generation capacity, not critical IT capacity. | ||||
Also reported as HOU3, Westway Park III, CyrusOne Houston West III.