Equinix SV11 is a two-story data center on the Great Oaks campus in South San Jose that was developed as part of Equinix's expansion at Great Oaks Boulevard. The project was announced as a new $142M facility named SV11 and intended to add an initial ~61,000 ft² of colocation space in its first phase with campus connectivity to SV1, SV5 and SV10. Planning/permitting records show the Great Oaks data center project area was subject to a Planned Development permit that covered two two‑story data center buildings totaling approximately 386,000 ft² on an approximately 11.15 gross-acre site (the broader project/site plans include multiple buildings and phases). Equinix stated SV11 would target LEED Silver and an ultra-low design average annual PUE of 1.17; Equinix press said SV11 was expected to open June 30, 2021. Local permitting and project documents (city of San Jose CEQA materials and project EIR filings) describe phased development across multiple parcels in the Great Oaks area (including SV10, SV11 and other SV buildings) and an associated backup generation project (Great Oaks South Generating Facility) described to support three data center buildings. Construction-status sources indicate SV11 construction/site improvements were in process, and Equinix and vendor pages describe operational features (fuel cells, advanced cooling, campus cross-connects). Specific commercial online dates, builder handover, and final operating-capacity declarations for the full site beyond the initial phase (e.g., final cabinet counts at full build, final MW electrical capacity assigned to SV11 alone) are not stated unambiguously in the available records and therefore are not inferred.