Pin Oak Creek Energy Center, LLC is a 444-MW (net summer) natural-gas simple-cycle peaking facility located at 1366 FM 488 near Fairfield in Freestone County, Texas. The facility comprises two General Electric 7FA.05 combustion turbines (GT5 and GT6), each rated at 212 MW net summer capacity, plus a 1.5 MW diesel emergency generator. (25%), with Freestone as the EIA utility operator. Calpine Corporation developed the project and obtained Texas Energy Fund financing; Constellation Energy acquired Calpine in January 2026, making Pin Oak Creek part of the Constellation fleet.
Mapped infrastructure geometry associated with this asset.
EIA plant 67500 · Inventory for Aug 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| GT5 | Natural Gas Fired Combustion Turbine | Operating | 222 | Unknown |
| GT6 | Natural Gas Fired Combustion Turbine | Operating | 222 | Unknown |
Mapped infrastructure geometry associated with this asset.
Similar plants ranked by technology, capacity, and distance.
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| GT5 | 222 MW 212 MW summer | Natural Gas Fired Combustion Turbine Natural Gas · GT | Apr 2026 | Operating |
| GT6 | 222 MW 212 MW summer | Natural Gas Fired Combustion Turbine Natural Gas · GT | Apr 2026 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
Calpine announced the close of the Texas Energy Fund loan agreement. The facility was under construction at the time and was expected to become operational the following year.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
2 ERCOT market resources · Gas turbine
Capacity factor is average output vs. this plant's observed peak.
Observed ERCOT settlement prices at PPEC_RN over 365 days (2025-10-12 to 2026-10-11).
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| Freestone Energy Center | 1,036 MW | TX | |
| Pin Oak Creek Energy Center, LLCCurrent | 444 MW | TX |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioConstellation Energy completed its acquisition of Calpine Corporation from Energy Capital Partners. Calpine, which held the 75% indirect interest in Pin Oak Creek through Freestone Power Generation LLC, became a wholly owned subsidiary of Constellation.
EIA-860 lists generator GT5, generator GT6 with this operating date.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Pin Oak Creek Energy Center reports 444 MW natural gas of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Aug 2026.
Pin Oak Creek Energy Center is a Natural Gas Fired Combustion Turbine facility in Freestone County, TX, participating in the ERCOT market.
Pin Oak Creek Energy Center is in Freestone County, TX, inside the ERCOT balancing area.
Pin Oak Creek Energy Center is operated by Freestone Power Generation LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Pin Oak Creek Energy Center reported 243.7 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Pin Oak Creek Energy Center ranks #108 of 829 operating plants of the same technology nationally. It ranks #14 of 78 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.