Ferdinand Energy Center reports 200 MW battery storage in ERCOT with linked market-resource generation history.
Mapped infrastructure geometry associated with this asset.
EIA plant 68915 · Inventory for Aug 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| 1 | Batteries | Operating | 200 | 800 |
Mapped infrastructure geometry associated with this asset.
Similar plants ranked by technology, capacity, and distance.
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| 1 | 200 MW 200 MW summer | Batteries Electricity used for energy storage · BA | Jun 2026 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
EIA-860 lists generator 1 with this operating date.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
EIA-923 reports gross generation and net grid exchange for storage plants. Gross generation is shown as a discharge proxy; it is not a cycle count or conventional capacity factor.
1 ERCOT market resource · Battery / storage
Cycles/day is discharged energy vs. usable capacity (~975 MWh). Capacity factor is avg discharge vs. peak.
Observed ERCOT settlement prices at FERD_ESS_RN over 304 days (2025-12-10 to 2026-10-09).
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Matched to the latest available ERCOT generation-interconnection queue record. Queue status and completion dates describe the queue record; operating status is verified separately against plant and market registrations.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Ferdinand Energy Center reports 200 MW battery storage of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Aug 2026.
Ferdinand Energy Center is a batteries facility in Bexar County, TX, participating in the ERCOT market.
Ferdinand Energy Center is in Bexar County, TX, inside the ERCOT balancing area.
Ferdinand Energy Center is operated by Ferdinand Grid, LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Ferdinand Energy Center reported 32.6 GWh over the twelve months to 2026-07. For a storage plant this is reported gross generation — a discharge proxy, not a cycle count or a conventional capacity factor.
By capacity, Ferdinand Energy Center ranks #58 of 1,061 operating plants of the same technology nationally. It ranks #20 of 254 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.