Frontier Windpower II
Frontier Windpower II reports 351.8 MW wind in SPP.
Overview
- Registry anchor
- Plant 62837
- plant-62837
Infrastructure record
- Turbines
- 9
- Manufacturers
- Nordex
- In service
Frontier Windpower II reports 351.8 MW wind in SPP.
EIA plant 62837 · Inventory for Aug 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| FW2 | Onshore Wind Turbine | Operating | 351.8 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Wind · 297.8 MW
Noble County
Wind · 300 MW
Garfield County
Wind · 299.3 MW
Kingfisher County
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| FW2 | 351.8 MW 351.8 MW summer | Onshore Wind Turbine Wind · WT | Feb 2021 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| Frontier Windpower IICurrent | 351.8 MW | OK | |
| Pisgah Ridge Solar, LLC | 250 MW | TX | |
| Mesquite Creek Wind | 211.2 MW | TX | |
| Ledyard Windpower, LLC | 207 MW | IA | |
| Mesteno | 201.6 MW | TX | |
| Los Vientos Wind 1B | 201.6 MW | TX | |
Project milestones and public references behind the asset profile.
350 MW expansion in Kay County, Oklahoma.
EIA-860 lists generator FW2 with this operating date.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Frontier Windpower II reports 351.8 MW wind of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Aug 2026.
Frontier Windpower II is a Onshore Wind Turbine facility in Kay County, OK, participating in the SPP market.
Frontier Windpower II is in Kay County, OK, inside the SPP balancing area.
Frontier Windpower II is operated by Deriva Energy according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Frontier Windpower II reported 765 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Frontier Windpower II ranks #38 of 1,374 operating plants of the same technology nationally. It ranks #3 of 71 in OK.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.