Maverick Wind Project, LLC is a 288 MW onshore wind facility located in Major, Garfield, and Kingfisher Counties, Oklahoma, southwest of Enid. PSO owns 45.5% and SWEPCO owns 54.5% of the project. The facility is interconnected through Western Farmers Electric Cooperative at the existing Dover 138 kV substation.
EIA plant 63494 · Inventory for Aug 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| GEN1 | Onshore Wind Turbine | Operating | 288 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| GEN1 | 288 MW 288 MW summer | Onshore Wind Turbine Wind · WT | Sep 2021 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
Maverick achieved financial close as part of Invenergy's North Central Energy Facilities development. Rabobank, CoBank, KeyBanc, and NordLB acted as lead arrangers for the financing, which included a construction loan and letter of credit.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| Northeastern | 1,477.5 MW | OK | |
| Riverside (OK) | 1,121.7 MW | OK | |
| Green Country Power Station | 903.9 MW | OK | |
| Southwestern | 656 MW | OK | |
| Tulsa | 348.2 MW | OK | |
| Comanche (OK) | 290 MW | OK | |
| Maverick Wind Project, LLCCurrent | 288 MW | OK | |
| Sundance Wind Project, LLC | 199 MW | OK |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioEIA-860 lists generator GEN1 with this operating date.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Maverick Wind Project reports 288 MW wind of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Aug 2026.
Maverick Wind Project is a Onshore Wind Turbine facility in Major County, OK, participating in the SPP market.
Maverick Wind Project is in Major County, OK, inside the SPP balancing area.
Maverick Wind Project is operated by Public Service Co of Oklahoma according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Maverick Wind Project reported 942.4 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Maverick Wind Project ranks #113 of 1,374 operating plants of the same technology nationally. It ranks #14 of 71 in OK.