Iron Mountain VA-7
Operating
Iron Mountain VA-7 is the fifth data center building on the company's Manassas, Virginia campus, at 8330 Bethlehem Road in Prince William County. The two-story, 290,750 square foot building has four data halls and a reported critical load of 36 MW. It opened in 2025 and earned a BREEAM Excellent rating. Cooling uses a closed-loop system, and at least 20% of heating and cooling electricity is generated on site from low or zero carbon technologies.
Loading map…
Overview
- Exact-site power
- 36 MW
- Critical IT Load · Reported
- Status
- Operating
- Operating building
- Facility size
- 290,750 sq ft
- Building
- Cooling design
- Reported
- Closed-loop cooling system
- Project scope
- Two-story facility with four data halls, electrical rooms, UPS rooms and administrative space; first standard-bay prototype built by Iron Mountain.
Power and grid
- Utility
- Virginia Electric & Power Co
The site also falls inside the Northern Virginia Elec Coop service territory.
- Market
- Nearest substations
- Unnamed substation230 kV
Facility and development
- Gross floor area (sq ft)
- 290,750
- Construction
- Two-story facility with four data halls, electrical rooms, UPS rooms and administrative space; first standard-bay prototype built by Iron Mountain.
- Cooling systems
- Closed-loop cooling system
- Environmental commitments
- BREEAM Excellent rating · At least 20% of electricity for heating and cooling demand generated on site from low or zero carbon technologies