KCE NY 1 is a 20 MW/8.4 MWh lithium-ion battery at the Luther Forest Technology Campus in Stillwater, New York. Key Capture Energy developed, owns and operates the facility; NEC Energy Solutions supplied its GSS storage platform and AEROS controls, and the project connects to NYSEG's 34.5 kV Luther Forest substation.
Mapped infrastructure geometry associated with this asset.
June 2026 preliminary EIA inventory; status OP.
EIA plant 62147 · Inventory for Oct 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| KNY1 | Batteries | Operating | 20 | 8.4 |
Mapped infrastructure geometry associated with this asset.
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| KNY1 | 20 MW 20 MW summer | Batteries BA | Mar 2019 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Where the plant sits in NYISO: its market, pricing node, utility territory and the network around it, each with how it is known.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
Project milestones and public references behind the asset profile.
Lithium-ion battery; June 2026 preliminary EIA inventory.
EIA-923 reports gross generation and net grid exchange for storage plants. Gross generation is shown as a discharge proxy; it is not a cycle count or conventional capacity factor.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
KCE NY 1 reports 20 MW battery storage of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Oct 2026.
KCE NY 1 is a Lithium-ion battery facility in Saratoga County, NY, participating in the NYISO market.
KCE NY 1 is in Saratoga County, NY, inside the NYISO balancing area.
KCE NY 1 is operated by KCE NY 1, LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
KCE NY 1 reports a commercial operation date of 2019-03. Source: EIA Oct 2026.
KCE NY 1 reported 24.2 GWh over the twelve months to 2025-12. For a storage plant this is reported gross generation — a discharge proxy, not a cycle count or a conventional capacity factor.
By capacity, KCE NY 1 ranks #407 of 1,061 operating plants of the same technology nationally. It ranks #2 of 53 in NY.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.