Live Oak Wind Project is a wind power facility with 199.5 MW of EIA-reported operating capacity in Schleicher County, Texas, registered as EIA Plant ID 61782. Engie North America is the registered plant entity or operator. Live Oak is a near-200 MW ERCOT onshore wind plant (199.5 MW) placed into service in 2019. Commercial operation began in 2019. Financing included a $147M tax-equity investment.
Onshore Wind Turbine
Live Oak Wind Project is operating.
ERCOT
EIA plant 61782 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| WTGS | Onshore Wind Turbine | Operating | 199.5 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| WTGS | 199.5 MW 199.5 MW summer | Onshore Wind Turbine WT | Mar 2019 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
On-site construction work began in March 2018; the developer engaged engineering/construction support to address early construction issues.
ERCOT · Schleicher County
ENGIE North America's official project page (doc_id 3) identifies the project and the owner/operator; a contemporaneous industry press report (doc_id 5) describing ENGIE North America's start of construction corroborates ENGIE's ownership/role.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
1 ERCOT market resource · Wind
Capacity factor is average output vs. this plant's observed peak.
Observed ERCOT settlement prices at WL_RANCH_RN over 365 days (2025-10-27 to 2026-10-26).
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| Priddy Wind Project | 302.4 MW | TX | |
| Prairie Hill Wind Project | 300 MW | TX | |
| Iron Star Wind Project | 297.6 MW | KS | |
| Solomon Forks Wind Project, LLC | 275.6 MW | KS | |
| Triple H Wind Project | 250.2 MW | SD | |
| King Plains Wind Project | 248.2 MW | OK | |
| ENGIE Long Draw Solar LLC | 225 MW | TX | |
| Las Lomas Wind Project | 201.6 MW | TX |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioENGIE North America signed construction financing, tax-equity financing and a power hedge for the Live Oak Wind Project; project-level financing amounts disclosed in ENGIE materials.
The project entered commercial operation in 2019 and began serving the ERCOT market.
EIA-860 lists generator WTGS with this operating date.
John Laing Group signed a purchase agreement to acquire a 75% stake in the 199.5 MW Live Oak Wind Project.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Live Oak Wind Project reports 199.5 MW wind of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Live Oak Wind Project is a Onshore Wind Turbine facility in Schleicher County, TX, participating in the ERCOT market.
Live Oak Wind Project is in Schleicher County, TX, inside the ERCOT balancing area.
Live Oak Wind Project is operated by Engie North America according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Live Oak Wind Project reports a commercial operation date of 2019. Current status: operating. Source: EIA Sep 2026.
Live Oak Wind Project reported 809.4 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
Live Oak Wind Project interconnects at WILSON RANCH SUBSTATION.
By capacity, Live Oak Wind Project ranks #334 of 1,374 operating plants of the same technology nationally. It ranks #107 of 230 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.