Meta New Albany LCO 1 is the individual Beech Road data-center building identified by the city as LCO DCB1. Municipal records report 362,317 square feet and a September 2023 construction start. By December 2025, the city listed it under partial occupancy, a different milestone from full commissioning. The building sits in the AEP Ohio service territory within PJM. Its profile separates this physical building from Meta's much larger New Albany campus, keeping campus investment, renewable-energy arrangements and expansion plans out of building-level electrical demand.
Loading map…
Overview
- Status
- Unknown
- Listed under partial occupancy in the city's December 2025 report; full commissioning is not established.
- Facility size
- 362,317 sq ft
- 1 reported building · Building
- Project scope
- New Albany's December 2024 construction report lists LCO DCB1 at 362,317 square feet, with construction beginning in September 2023. This is the city's reported building area, not critical IT space.
- Power and grid
- Served by AEP Ohio in PJM Interconnection.
- Compute role
- Meta describes New Albany as infrastructure supporting its technologies and services. Its campus began development in 2017, before the city's September 2023 start date for this building.
Power and grid
- Utility
- AEP Ohio
- Market
- Nearest substations
- Jug Street345 kV
- Unnamed substation138 kV
Facility and development
- Gross floor area (sq ft)
- 362,317
- Buildings
- 1
- Construction
- New Albany's December 2024 construction report lists LCO DCB1 at 362,317 square feet, with construction beginning in September 2023. This is the city's reported building area, not critical IT space. LCO DCB2 is separately listed at the same street address.
- Operating context
- Meta describes New Albany as infrastructure supporting its technologies and services. Its campus began development in 2017, before the city's September 2023 start date for this building. The campus opening date therefore does not date LCO 1's commissioning.