Meta New Albany LCO 2
Unknown
Meta New Albany LCO 2 is a separately identified data-center building at the company's Beech Road campus. New Albany reports 302,944 square feet, a September 2023 construction start, SNHA as architect and Turner Construction as contractor. The city still included LCO DCB2 in its December 2025 construction report and lists LCO 2 on its project-updates page. The exact building is located in AEP Ohio's PJM service territory. This profile distinguishes its construction record from LCO 1's partial-occupancy milestone and from unallocated campus power and investment totals.
Loading map…
Overview
- Status
- Unknown
- Included in the December 2025 construction-status report and the city's undated project-updates listing; a building-specific commissioning date is not established.
- Facility size
- 302,944 sq ft
- 1 reported building · Building
- Project scope
- New Albany's December 2025 construction report lists LCO DCB2 at 302,944 square feet and gives a September 2023 start. The city's project-updates page identifies SNHA as architect and Turner Construction as contractor.
- Power and grid
- Served by AEP Ohio in PJM Interconnection.
- Compute role
Power and grid
- Utility
- AEP Ohio
- Market
- Nearest substations
- Jug Street345 kV
- Unnamed substation138 kV
Facility and development
- Gross floor area (sq ft)
- 302,944
- Buildings
- 1
- Construction
- New Albany's December 2025 construction report lists LCO DCB2 at 302,944 square feet and gives a September 2023 start. The city's project-updates page identifies SNHA as architect and Turner Construction as contractor. The municipal area describes this building, not the campus or its critical IT floor space.
- Operating context
- LCO 2 belongs to Meta's New Albany infrastructure campus. Meta says that campus supports its technologies and services. Neither the municipal building record nor Meta's campus page identifies LCO 2's application mix, accelerator count or critical IT load.