Mountaineer Wind Energy Center is a 66 MW onshore wind facility in Tucker County, West Virginia, built as a single EIA-reported generating unit that has been operating since December 2002. The site comprises 44 NEG Micon 1.5 MW turbines strung along Backbone Mountain, and it was the first wind farm built in West Virginia and, when it opened, the largest east of the Mississippi River. The project was developed and originally operated by FPL Energy, whose parent later rebranded as NextEra Energy Resources, before Sequitur Renewables, LLC — a portfolio company of ArcLight Capital Partners — acquired it in 2022 along with other operating wind farms in Pennsylvania and West Virginia. Sequitur Renewables now owns and operates Mountaineer as part of a five-farm Mid-Atlantic wind platform totaling roughly 185 MW. The plant sells its output into the PJM market, settling near the William 138 kV point of interconnection in Thomas, Tucker County. No unit retirements or plant-wide closure date are on file for Mountaineer.
EIA plant 55986 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| WT1 | Onshore Wind Turbine | Operating | 66 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| WT1 | 66 MW 66 MW summer | Onshore Wind Turbine WT | Dec 2002 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Where the plant sits in PJM: its market, pricing node, utility territory and the network around it, each with how it is known.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
Backbone Mountain Windpower, LLC filed an application with the West Virginia Public Service Commission to authorize construction and operation of the wind facility.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| Mountaineer Wind Energy CenterCurrent | 66 MW | WV | |
| Waymart Wind | 64.5 MW | PA | |
| Meyersdale Windpower, LLC | 30 MW | PA | |
| Diablo Winds LLC | 18 MW | CA | |
| Mill Run Windpower LLC | 15 MW | PA | |
| Somerset Windpower LLC | 9 MW | PA |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioBackbone Mountain Windpower filed an Application for Determination of Exempt Wholesale Generator Status with FERC.
FPL Energy purchased the Backbone Mountain project from Atlantic Renewable Energy Corporation and assumed development and operation responsibilities.
FPL Energy announced construction of the Mountaineer Wind Energy Center as one of the largest wind projects in the eastern United States. Construction began summer 2002. Entire output contracted to Exelon Power Team for 20 years.
EIA-860 lists generator WT1 with this operating date.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Mountaineer Wind Energy Center reports 66 MW wind of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Mountaineer Wind Energy Center is a Onshore Wind Turbine facility in Tucker County, WV, participating in the PJM market.
Mountaineer Wind Energy Center is in Tucker County, WV, inside the PJM balancing area.
Mountaineer Wind Energy Center is operated by Sequitur Renewables, LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Mountaineer Wind Energy Center reported 111.7 GWh over the twelve months to 2026-08. Figures are net generation as filed to EIA-923.
By capacity, Mountaineer Wind Energy Center ranks #820 of 1,374 operating plants of the same technology nationally. It ranks #6 of 8 in WV.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.