Petersburg Energy Center is an operating 250 MW solar plant paired with a 45 MW / 180 MWh battery in Pike County, Indiana. A 6.6-mile 345 kV line connects the facility to the Petersburg substation.
Mapped infrastructure geometry associated with this asset.
EIA plant 69428 · Inventory for Aug 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| BA | Batteries | Operating | 250 | 180 |
| PECPV | Solar Photovoltaic | Operating | 250 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| BA | 250 MW 250 MW summer | Batteries Electricity used for energy storage · BA | Jan 2026 | Operating |
| PECPV | 250 MW 250 MW summer | Solar Photovoltaic Solar · PV | Jan 2026 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Project milestones and public references behind the asset profile.
AES Indiana filed Cause No. 45591 with the Indiana Utility Regulatory Commission seeking approval for acquisition and development of the Petersburg Energy Center, the tax-equity joint-venture structure, the capacity agreement and contract for differences, and associated ratemaking treatment.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
AES Indiana announced plans to acquire and construct a 250 MW solar plus 180 MWh energy storage facility from a subsidiary of NextEra Energy Resources in Pike County, Indiana. NextEra Energy Resources was named as developer and constructor, subject to IURC approval.
The IURC issued its final order approving the Petersburg Energy Center project, including the tax-equity joint-venture structure, capacity agreement, and contract for differences, and declining to exercise jurisdiction over the project company as a public utility.
AES Indiana completed the acquisition of Petersburg Energy Center, LLC including development of a 250 MW solar and 45 MW / 180 MWh storage facility. The fair value of consideration paid was approximately $49 million. The project entered construction-stage development.
AES entered into agreements for project development and for the purchase of 100% of the membership interests in Petersburg Energy Center, LLC, a 250 MW solar and 180 MWh battery energy storage project.
AES Indiana reported that the 250 MW solar and 180 MWh storage facility was under construction and expected to be operational by the end of 2025.
AES Indiana sold a noncontrolling interest in the Petersburg Energy Center energy storage project to a tax-equity investor, resulting in an initial contribution of $53.0 million.
EIA-860 lists generator BA, generator PECPV with this operating date.
AES Indiana sold additional noncontrolling interests in the Petersburg Energy Center project to the tax-equity investor, resulting in approximately $119.9 million increase in noncontrolling interests.
AES Indiana announced that Petersburg Energy Center is officially in service, comprising 250 MW of solar generation (515,388 solar modules) and 180 MWh of battery storage. The facility was identified as essential for replacing retired Petersburg Units 1 and 2 and meeting MISO increased seasonal capacity requirements.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Petersburg Energy Center reports 250 MW battery storage + 250 MW solar of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Aug 2026.
Petersburg Energy Center is a Solar Photovoltaic, Batteries facility in Pike County, IN, participating in the MISO market.
Petersburg Energy Center is in Pike County, IN, inside the MISO balancing area.
Petersburg Energy Center is operated by Petersburg Energy Center, LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Petersburg Energy Center reported 219.9 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Petersburg Energy Center ranks #33 of 1,061 operating plants of the same technology nationally. It ranks #1 of 9 in IN.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.