Peyton Creek Wind Farm II is a 243 MW wind project near Bay City, Texas. RWE reported the project commissioned in 2025, bringing the Peyton Creek complex to 394 MW; a separate RWE announcement identifies Microsoft as the buyer under a 15-year power-purchase agreement.
EIA plant 67700 · Inventory for Aug 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| WT2 | Onshore Wind Turbine | Operating | 243 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| WT2 | 243 MW 243 MW summer | Onshore Wind Turbine Wind · WT | Apr 2025 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
RWE announced the official groundbreaking for Peyton Creek II and two 15-year power-purchase agreements under which Microsoft would purchase clean electricity from RWE's new Texas wind projects.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
1 ERCOT market resource · Wind
Capacity factor is average output vs. this plant's observed peak.
Observed ERCOT settlement prices at PCT_RN over 365 days (2025-10-12 to 2026-10-11).
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Matched to the latest available ERCOT generation-interconnection queue record. Queue status and completion dates describe the queue record; operating status is verified separately against plant and market registrations.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| Bright Arrow Solar, LLC | 403.6 MW | TX | |
| Cartwheel 1 - Storage, LLC | 300 MW | TX | |
| Peregrine Solar | 300 MW | TX | |
| Fifth Standard Solar PV, LLC (Hybrid) | 287 MW | CA | |
| Radfords Run Wind Farm | 278 MW | IL | |
| Emily Solar, LLC | 273.6 MW | IL | |
| Pyron Wind Farm LLC Hybrid | 258.9 MW | TX | |
| Copper Mountain Solar 3 | 255 MW | NV |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioEIA-860 lists generator WT2 with this operating date.
RWE reported that Peyton Creek II, a 243 MW wind project in Bay City, Texas, had recently been commissioned, bringing the total generating capacity of the Peyton Creek Complex to 394 MW. The project created approximately 250 jobs during construction and the full complex supports 20 full-time local jobs in operation.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Peyton Creek Wind Farm II reports 243 MW wind of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Aug 2026.
Peyton Creek Wind Farm II is a Onshore Wind Turbine facility in Matagorda County, TX, participating in the ERCOT market.
Peyton Creek Wind Farm II is in Matagorda County, TX, inside the ERCOT balancing area.
Peyton Creek Wind Farm II is operated by RWE Clean Energy according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Peyton Creek Wind Farm II reported 622.7 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Peyton Creek Wind Farm II ranks #166 of 1,374 operating plants of the same technology nationally. It ranks #53 of 230 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.