Plaquemine Cogeneration Plant is a gas-fired facility at Dow's chemical complex in Plaquemine, Louisiana, built around four 170 MW combustion turbine generators and a 200 MW steam turbine for 880 MW of power plus steam. AEP developed it, and Dow leased and operated it from commercial operation on March 18, 2004. Dow completed its purchase from an AEP subsidiary on December 1, 2006, to generate power and steam more efficiently for the site.
Mapped infrastructure geometry associated with this asset.
EIA plant 55419 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| G500 | Natural Gas Fired Combined Cycle | Operating | 198 | Unknown |
| G600 | Natural Gas Fired Combined Cycle | Operating | 198 | Unknown |
| G700 | Natural Gas Fired Combined Cycle | Operating | 198 | Unknown |
| G800 | Natural Gas Fired Combined Cycle | Operating | 198 | Unknown |
| ST5 |
Mapped infrastructure geometry associated with this asset.
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| G500 | 198 MW 151 MW summer | Natural Gas Fired Combined Cycle CT | Mar 2004 | Operating |
| G600 | 198 MW 151 MW summer | Natural Gas Fired Combined Cycle CT | Mar 2004 | Operating |
| G700 | 198 MW 151 MW summer | Natural Gas Fired Combined Cycle CT | Mar 2004 | Operating |
| G800 | 198 MW 151 MW summer | Natural Gas Fired Combined Cycle CT | Mar 2004 | Operating |
| ST5 | 195 MW | |||
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Where the plant sits in MISO: its market, pricing node, utility territory and the network around it, each with how it is known.
The site also falls inside the Pointe Coupee Elec Member Corp service territory.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
EIA-860 lists generator G500, generator G600, generator G700, generator G800, generator ST5 with this operating date.
| Natural Gas Fired Combined Cycle |
| Operating |
| 195 |
| Unknown |
| ST6 | Natural Gas Fired Combined Cycle | Operating | 48.9 | Unknown |
|---|
| ST7 | Natural Gas Fired Combined Cycle | Operating | 48.9 | Unknown |
|---|
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
EIA-860 lists generator ST6, generator ST7 with this operating date.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Plaquemine Cogeneration Plant reports 1,084.8 MW natural gas of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Plaquemine Cogeneration Plant is a Natural Gas Fired Combined Cycle facility in Iberville County, LA, participating in the MISO market.
Plaquemine Cogeneration Plant is in Iberville County, LA, inside the MISO balancing area.
Plaquemine Cogeneration Plant is operated by Dow Chemical Co according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Plaquemine Cogeneration Plant reported 5,682.3 GWh over the twelve months to 2026-08. Figures are net generation as filed to EIA-923.
By capacity, Plaquemine Cogeneration Plant ranks #84 of 540 operating plants of the same technology nationally. It ranks #2 of 15 in LA.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.