Prime SJC03
Unknown
Prime SJC03 is a three-story data-center development at 2215 Martin Avenue in Santa Clara. City records identify the project as LS1 and document its 2019 approval on a 1.68-acre redevelopment site. Prime currently lists SJC03 as an enterprise facility in development with 9 MW of advertised capacity. The individual listing does not establish measured demand or energized IT load. Civil engineering records describe an equipment yard with six diesel generators and coordinated water, sewer, storm-drain and fire-protection infrastructure.
Loading map…
Overview
- Status
- Unknown
- Prime lists SJC03 as Development.
- Site
- 1.68 acres
- 1 reported building · Building
- Compute profile
- Enterprise
- Project scope
- The city approved the LS1 project on September 18, 2019; the Planning Commission upheld approval on November 13, 2019. BKF describes civil engineering and survey work with Gensler and Syska Hennessy for the redevelopment at 2215 Martin.
- Compute role
- Prime markets the exact facility for single- or multi-tenant use and advertises 9 MW without specifying the individual capacity basis. This is not a measurement of operating demand.
Power and grid
- Utility
- City Of Santa Clara
- Market
Facility and development
- Site area (acres)
- 1.68
- Buildings
- 1
- Construction
- The city approved the LS1 project on September 18, 2019; the Planning Commission upheld approval on November 13, 2019. BKF describes civil engineering and survey work with Gensler and Syska Hennessy for the redevelopment at 2215 Martin.
- Facility class
- Enterprise