QTS Santa Clara 1
Operating
QTS Santa Clara 1 is a multi-building campus at 2805 Mission College Boulevard. QTS reports four acres and 7.5 MW of critical power capacity for the campus, rather than for an individually identified building. Its site-specific features include seismic protection for internal and customer equipment, customer office space and equipment-preparation areas. The operator also lists Energy Star and LEED Silver credentials. This profile keeps the campus together instead of counting nearby OSM building anchors as separate 7.5-MW facilities.
Loading map…
Overview
- Campus power
- 7.5 MW
- Critical IT Load · Reported
- Status
- Operating
- Operating campus
- Site
- 4 acres
- Campus
- Compute profile
- Colocation
- Project scope
- Multi-building campus with seismic protection for equipment and customer workspace.
- Power and grid
Power and grid
- Utility
- City Of Santa Clara
- Market
- Nearest substations
Facility and development
- Site area (acres)
- 4
- Construction
- Multi-building campus with seismic protection for equipment and customer workspace.
- Facility class
- Colocation
- Operating context
- Customer office space, conference rooms and preparation areas are offered.
- Environmental commitments