Sequoia 1
Enbridge Solar (Sequoia I), LLC - Eastland County - ERCOT
Sequoia 1 is a 401.4 MW solar photovoltaic facility in Eastland County, Texas, identified in FERC/EIA records as plant 68200 with generator ID SEQ1. The facility is owned and operated by Enbridge Solar (Sequoia I), LLC, formerly Enbridge Solar (Eldorado), LLC. It represents the approximately 401 MW Phase One of Enbridge's 815 MW Sequoia Solar project. Sequoia 1 became operational in December 2025 and reached full operational status in May 2026.
