Skeleton Creek Energy Center Hybrid is a 752 MW batteries, solar photovoltaic, onshore wind turbine plant in Garfield County. Skeleton Creek Energy Center is a NextEra Energy Resources hybrid in Garfield, Alfalfa and Major counties, Oklahoma, built for Western Farmers Electric Cooperative under a power purchase agreement announced in July 2019. Its 250 MW wind farm of about 90 GE turbines began generating on December 16, 2020. NextEra brought 252 MW of 4-hour batteries online in December 2025 at OG&E's 345 kV Woodring substation in SPP. A 250 MW solar array, first due by the end of 2023, was delayed by local opposition and permit denials.
EIA plant 62494 · Inventory for Aug 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| SCBAT | Batteries | Operating | 252 | 1,008 |
| SCSOL | Solar Photovoltaic | Operating | 250 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| SCBAT | 252 MW 252 MW summer | Batteries Electricity used for energy storage · BA | Dec 2025 | Operating |
| SCSOL | 250 MW 250 MW summer | Solar Photovoltaic Solar · PV | Dec 2025 | Operating |
| SKC | 250 MW 250 MW summer | Onshore Wind Turbine Wind · WT | Dec 2020 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
Wind, solar and storage PPA with NextEra.
| SKC |
|---|
| Onshore Wind Turbine |
| Operating |
| 250 |
| Unknown |
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
EIA-860 lists generator SKC with this operating date.
250 MW.
RUS evaluating financial assistance.
Skeleton Creek II (200 MW) and Woodring expansion (52 MW), both 4-hour.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Skeleton Creek Energy Center reports 252 MW battery storage + 250 MW solar + 250 MW wind of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Aug 2026.
Skeleton Creek Energy Center is a Batteries, Solar Photovoltaic, Onshore Wind Turbine facility in Garfield County, OK, participating in the SPP market.
Skeleton Creek Energy Center is in Garfield County, OK, inside the SPP balancing area.
Skeleton Creek Energy Center is operated by Skeleton Creek Energy Center according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Skeleton Creek Energy Center reported 1,443.5 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Skeleton Creek Energy Center ranks #32 of 1,061 operating plants of the same technology nationally. It ranks #1 of 5 in OK.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.