7 EIA-registered power plants in Upton County, TX totalling 1.8 GW of nameplate capacity, ranked and mapped inside ERCOT.
7 matching plants·ranked by nameplate capacity
| Rank | Plant | Capacity | ||||
|---|---|---|---|---|---|---|
| 1 | High Lonesome Wind Power, LLC HybridHigh Lonesome Wind Power, LLCDetailed profile | 562.8 MW | Batteries, Onshore Wind Turbine | High Lonesome Wind Power, LLC | Upton County | |
| 2 | Roadrunner, LLC HybridRoadrunner Solar, LLCDetailed profile | 463.3 MW | Solar Photovoltaic, Batteries | Roadrunner Solar, LLC | Upton County | |
| 3 | King Mountain Wind Ranch 1FPL Energy Upton Wind LPDetailed profile | 278 MW | Onshore Wind Turbine | FPL Energy Upton Wind LP | Upton County | |
| 4 | Castle Gap Solar HybridUpton County Solar 2 LLCDetailed profile | 189.9 MW | Batteries, Solar Photovoltaic | Upton County Solar 2 LLC | Upton County | |
| 5 | Appaloosa Run WindAppaloosa Run Wind, LLCDetailed profile | 171.8 MW | Onshore Wind Turbine | Appaloosa Run Wind, LLC | Upton County | |
| 6 | Upton County SolarRWE Clean EnergyDetailed profile | 150 MW | Solar Photovoltaic | RWE Clean Energy | Upton County | |
| 7 | Upton County BESSVESI Upton County BESS, LLC | 24.8 MW | Batteries | VESI Upton County BESS, LLC | Upton County |
County assignment and capacity come from the EIA generator inventory. Capacity is nameplate capacity, not seasonal capability or available operating capacity. A plant can include multiple generators and technologies.